Preview site — this demo comes down in 07d00h00m00s
We Make Your Life Easier Project Management · Framing · Siding · Finish Bilingual · Service bilingue
Call or text: 123-456-7890

Home/Services/New Home Construction

New Home Construction

From a slab and a set of drawings to a house you can move into — managed as one job rather than a relay race between trades who have never met.

One company, four stages

Most new builds are assembled from separately hired trades with nobody owning the whole. We do the four stages that most determine how a house turns out — management, framing, envelope and finish — and coordinate the rest around them.

How a build runs

  • Before anything is ordered. We go through the drawings, flag what will be expensive or slow, and build a schedule backwards from your close-in date.
  • Site and foundation. Coordinated with the excavator and concrete crew so framing can start clean.
  • Framing and close-in. Floor systems, walls, roof, sheathing, wrap and windows — the sequence that gets the building weather-tight.
  • Exterior. Siding, soffit, fascia and trim, detailed for wherever on the coast you are building.
  • Interior. Mechanical and drywall trades scheduled in, then our finish carpentry.
  • Handover. Walk it together, fix the list, hand you the keys.

Timing a build in this climate

The exterior season here is roughly May to November. A build that starts too late in the year either sits through winter half-closed or gets finished in conditions that cost more and produce worse work. We will be straight with you about whether your intended start date gets you closed in, even when the honest answer is "start in spring instead."

Building on a rural or coastal lot

Much of our area is acreage, well and septic, and long driveways. None of that is difficult, but it has to be sequenced — services and site access sorted before the first delivery, not during.

New Home Construction work in progress

The trade

What good new home construction looks like

The difference between adequate and good in this trade is almost never visible on handover day. It shows up in year three.

  • Sequence. Work that arrives in the right order costs less than work that has to be undone and redone.
  • Tolerance. Square, plumb and level are not aspirations — every trade that follows inherits whatever tolerance you accept.
  • Detailing. The parts nobody photographs, like laps, flashings and fastening, are what decide whether it lasts on this coast.
  • Honesty. If we find something behind the wall, you hear it with photographs before we carry on.
Request a Quote

On site

New Home Construction, in practice

Photos marked Our build are TMD Homes projects in southeastern New Brunswick.

New Home Construction on a TMD Homes project

Questions

New Home Construction FAQ

Do I need to have plans drawn before I call you?

No. It is often better to talk before the drawings are finalised, because some design decisions are far more expensive to build than they look on paper and it is cheap to change them early.

Can you build on a rural lot with well and septic?

Yes, and a lot of our area is exactly that. It needs more lead time on services and site access, which we plan for rather than discover.

When should I start planning a build for next summer?

Earlier than feels necessary. Framing slots for a summer start are often committed by late winter, and material lead times sit on top of that.

More services

We also handle

Let’s talk about it

Free consultations across Moncton, the tri-community and the coast from Cap-Pelé to Richibucto.

Call Now Free Quote