It looks like the same trade repeated, and that is precisely the point — but the details that matter are different. Party wall and fire separation assemblies have to be built exactly as specified and inspected as such. Sequencing across a row matters more than on a single house, because a delay in unit three stalls everything behind it.
The upside is that once a crew has built the assembly correctly a few times, the pace goes up and the error rate goes down. That is the efficiency a developer is actually buying.
Draw schedules, inspection stages and occupancy dates drive everything on a multi-unit job. We plan our framing and exterior sequence around those rather than our own convenience, and we will tell you at quote stage where we think the programme is unrealistic.
Most of this work sits in the tri-community, where the growth is. Several of the projects in our gallery are exactly this: townhouse rows at framing, at wrap, and finished.
The trade
The difference between adequate and good in this trade is almost never visible on handover day. It shows up in year three.
On site
Photos marked Our build are TMD Homes projects in southeastern New Brunswick.
Questions
Yes. Framing and siding packages by phase, scheduled around draw stages and occupancy dates.
Yes, and it is more efficient that way. Talk to us about volume and sequencing and we will tell you what we can commit to and when.
Yes, built and inspected to the specified assembly. Those are not details to improvise on.
Free consultations across Moncton, the tri-community and the coast from Cap-Pelé to Richibucto.